ITEM 1. WELCOME BY
THE CHAIR, APOLOGIES & CONFIRMATION OF DRAFT AGENDA
ITEM 2. CONFIRM
DRAFT MINUTES FOR THE MEETING ON 20 FEBRUARY 2018 AND
REVIEW ACTION ITEM LIST
|
|
Robin |
Minutes adopted with the following change: – Nic Moen introduction – “Ran the Terminals” instead of “Terminals |
Action Item List |
|
|
|
All actions complete. |
|
|
|
ITEM 3. COMMUNITY
|
|
EIP 2014 – |
|
Phil |
Testing Shows nothing out of parameters of license. |
Michael |
When I read that I thought back it was rare to have nothing out of |
Gary |
We have lost a lot of Acrylate products which used to create |
Robin |
All Community Reports have been distributed and are now also on the |
|
EIPs often are confined to matters outside those the company had |
|
|
|
|
ITEM 4. STEPHEN
|
|
Robin |
Since Stephen is not in attendance, Ryan will run through the IN’s. |
Ryan |
All 8 Improvement Notices are now closed out. New Permit to |
Gary |
WorkSafe reviewed the Foam System and the installation of foam |
Faye |
Were you delivering something far too strong? |
Gary |
The foam delivered was at a concentrate rate of 14%, when only 6% |
Ian |
How did WorkSafe know the % of the foam? |
Gary |
Routine testing showed % high than needed. |
|
Foam system contractor came on site to do system checks. We have now changed the procedure. No flammable truck loading |
Robin |
Does this mean that you isolate areas just one place at a time? |
Phil |
Yes, we isolate one area instead of whole sections. Weekly/Monthly |
Ian |
Foam is expensive stuff to purchase |
Phil |
Every year we do an actual test |
Ian |
Coincidental that WorkSafe were on site at the time? |
Gary |
Yes |
Robin |
How did they detect it? |
Gary |
One of the WorkSafe personnel asked the operator is that the |
Faye |
Can you not use a bit of red tape to notify position of valve? |
Gary |
1,200 locks and tags have now been installed around the site and |
Faye |
Feels clumsy to me as you have walk backwards and forwards to the |
Gary |
There is a printout you can take with you. |
Phil |
Every valve has a tag which tells you whether the valve should be |
Faye |
Is that not an onerous system? |
Ryan |
The fact that it is onerous is part of the safety factory. |
Ian |
Fool proof system that I know is an individual doing the work has |
Gary |
Yes, on the fire system |
Michael |
Can you tell on all the valves so it is obvious to those looking |
Gary |
Yes |
Ryan |
Changing the SMS audit protocol to include: – · · · |
Robin |
Would that go into your EIP? |
Phil |
This is about our whole Environment Plan and I can request that it |
Robin |
I am used to a definition of Environment Plan is to include |
Phil |
The SMS is that which includes everything. |
Ian |
Can you remind us of the timeframe of completion? |
Phil |
3-4 months |
Ryan |
A WorkSafe Audit was conducted in Geelong only a few months |
Faye |
Is the site isolated out of hours and public holidays? |
Phil |
We isolate all tank valves over all the site out of working hours. |
Gary |
Valve register is only the critical valves. |
|
We have a tag peg board where they remove the key and return at |
Faye |
Temperature variations during storms are there allowances? |
Gary |
There are high LEL alarms around the site which would alert us to |
Faye |
Are there back up contacts if the rostered operators are unavailable? |
They are no longer referred to as PIN notices now just “IN” |
|
Robin |
Ryan, could you go through the PIN notices one by one please? |
Ryan |
Complete testing to ensure |
|
Establish |
3 |
Implement |
4 |
Develop |
5 |
Develop |
6 |
Develop |
7 |
Develop procedures for |
8 |
Audit new Permit to Work |
Ryan |
All the above items have now been completed, as generally |
Robin |
Inquired about the Improvement Notices submitted by the Health |
Phil |
All items proved to be unfounded. |
ITEM 5. STEPHEN
TO ADVISE ON CHANGES TO SEPP LEVELS, AND THE TERMINALS
PTY LTD RESPONSE
.
Ryan |
Then went through the notes prepared by Stephen Lewis. |
Robin |
Can you email me a copy of Stephens notes on SEPP? |
Ryan |
Certainly |
Faye |
Any excesses reported? |
Ryan |
No |
Faye |
Any phthalates? |
Gary |
They were below the recommended level |
Ian |
As I drove in this afternoon I noticed they were doing things on |
Phil |
The new road tunnel |
Robin |
The comments you have noted on Stephens report, do they update any |
ACTION |
Ryan to scan and send a copy of Stephen’s SEPP presentation with |
Robin |
Only 1 action outstanding on SEPP Levels |
|
|
ITEM 6 REPORTS
FROM TERMINALS AND THE CITY OF MARIBYRNONG
Phil |
Discussed the Dashboard of incidents. Nothing above severity |
Ian |
Is there a way to get a product column? |
Robin |
There is no key to identify products. Spill of Tallow not as |
Phil |
Any spill is reportable. A spill is a spill. |
Robin |
So WorkSafe is happy with this way of reporting? |
Phil |
Yes. We have an emissions report that we generate each year. |
Michael |
Are there any commercial reasons not to include the product in the |
Phil |
Yes, and no I cannot give you that detail on the report. I |
Robin |
When I get this report 3 days prior to the meeting I will then |
Michael |
Doesn’t matter what the product was that leaked. If it is |
Phil |
I will let you know at the meeting but not recorded in the report. |
Ian |
The incident where the ship didn’t follow instructions to stop the |
Phil |
I do not have that information available to me here now. |
Ryan |
Why mention incidents other than Severity 3? |
Michael |
It is good to see all the others just in case they escalate to a |
ACTION |
Phil to advise what the product was for the incident IRF-0318-0032. |
Phil |
Emergency Exercise conducted – unannounced – Potential |
Faye |
What was the response time? |
Gary |
Approximately 30 seconds |
Ian |
When you refer to gantry does that describe the overhead |
Gary |
It refers to the roofed area over the loading area. |
Phil |
There are 3 incidents open of which 2 relate to combustor and we |
Robin |
Often enough the open ones are interesting to hear how they are |
Phil |
Yes, I will put in a mention of the close out of the open |
Robin |
Potential incidents label on pie chart “Other” potential |
Phil |
Actions are around things that are unable to be fixed straight |
Ian |
Immediate action would be to talk to the captain of the ship in |
Michael |
If something fixed on the spot – no action |
|
What about if there was something to be learnt, would that be an |
Phil |
Apart from talking to the captain there was nothing more we could |
Ian |
How does the person get the “Stop, Stop” message? |
Gary |
Via radio |
Robin |
Thank you, Phil, for the report |
Phil
|
With regards to Tank 49 it is a mild steel tank which is not an Actions will be available next meeting. Loss of containment meant ground water testing was |
|
Terminals has been issued with a fine from the EPA. We kept |
ITEM 7. ROBIN TO
ADVISE ON THE STATUS OF THE ADVERTISEMENT FOR NEW COMMUNITY MEMBERS.
I have provided a draft to Phil and Terminals will put an |
ITEM 8. ROBIN TO
ADVISE ON THE STATUS OF A PROGRAM FOR INVITING KEY AGENCIES
TO FUTURE MEETING
Robin |
Who should we ask to attend future meetings? One organization to be targeted to attend first. 1. 2. 3. |
ACTION |
Robin to invite a representative of WorkSafe to our next meeting. |
ITEM 9. OTHER
BUSINESS
Faye |
What is the impact of the next road tunnel to Terminals? |
Phil |
No impact to us, it is well away from the site. Stolt Haven |
|
|
Faye |
Funding of Community Grants, are they a possibility of happening soon? |
Gary |
In the past Terminals committed $20K each year |
Phil |
I will ask the board, though probably will not happen this year as |
ACTION |
Phil to advise plans for funding the Community Grants program.
|
Robin |
(This matter was discussed earlier in the meeting) What is the |
Phil |
Phil advised that the space for solar panels had been |
ACTION |
Phil to advise if a viable proposal for solar panels can be
|
|
MEETING CLOSED 5:15pm
|
|